Why wait weeks for D38999 connectors
Our lead time is measured in days, not weeks
Our lead time is measured in days, not weeks
Theres no need to wait for D38999/32 or D38999/33 caps
Don’t wait months
No need to wait for K Class Stainless Steel D38999 connectors
Our lead time is measured in days from receipt of order, not weeks
Apollo US has reached CMMC Level 2 compliance
No need to wait for Mil-Spec hardware
At Apollo we love π interconnect π
Are you frustrated with long lead times for D38999 or 26428 connectors?
Rectangular & Circular connectors, now available
Are you frustrated with long lead times for hermetic connectors?
Positronic Amphenol visit to Apollo Southampton